The FCST setup has stale step references and an invalid target enable
path. A reader following it reaches the wrong prerequisites and cannot
address enabled after entering the target directory.
Commit 87bde8ab0e ("fcst/README: Update this README file") shortened
the procedure without updating its cross-references. Commit 7a12737c9d
("Simplify README by eliminating example using of ini_groups.") changed
the LUN setup but left $LPORT duplicated in the following path.
Repair the references, terminology and relative enable command,
and clarify the LUN 0 compatibility note. The same procedure installs
packages, creates an FCoE interface, loads modules and exports storage,
so require authorization for the host, CNA, fabric, initiators and
backing devices before it is run.
that accepts FCP requests from libfc HBAs running Fibre Channel
over Ethernet (FCoE) and passes them to SCST.
Signed-off-by: Joe Eykholt <jeykholt@cisco.com>
git-svn-id: http://svn.code.sf.net/p/scst/svn/trunk@1514 d57e44dd-8a1f-0410-8b47-8ef2f437770f