Lakshmi Narayanan Sreethar ee74fe4e0e [Backport 6.1] sstables: do not reload components of unlinked sstables
The SSTable is removed from the reclaimed memory tracking logic only
when its object is deleted. However, there is a risk that the Bloom
filter reloader may attempt to reload the SSTable after it has been
unlinked but before the SSTable object is destroyed. Prevent this by
removing the SSTable from the reclaimed list maintained by the manager
as soon as it is unlinked.

The original logic that updated the memory tracking in
`sstables_manager::deactivate()` is left in place as (a) the variables
have to be updated only when the SSTable object is actually deleted, as
the memory used by the filter is not freed as long as the SSTable is
alive, and (b) the `_reclaimed.erase(*sst)` is still useful during
shutdown, for example, when the SSTable is not unlinked but just
destroyed.

Fixes https://github.com/scylladb/scylladb/issues/19722

Closes scylladb/scylladb#19717

* github.com:scylladb/scylladb:
  boost/bloom_filter_test: add testcase to verify unlinked sstables are not reloaded
  sstables: do not reload components of unlinked sstables
  sstables/sstables_manager: introduce on_unlink method

(cherry picked from commit 591876b44e)

Backported from #19717 to 6.1

Closes scylladb/scylladb#19828
2024-07-24 09:03:52 +03:00
..
2024-07-08 18:16:27 +02:00
2024-06-20 18:45:31 +03:00

Scylla in-source tests.

For details on how to run the tests, see docs/dev/testing.md

Shared C++ utils, libraries are in lib/, for Python - pylib/

alternator - Python tests which connect to a single server and use the DynamoDB API unit, boost, raft - unit tests in C++ cql-pytest - Python tests which connect to a single server and use CQL topology* - tests that set up clusters and add/remove nodes cql - approval tests that use CQL and pre-recorded output rest_api - tests for Scylla REST API Port 9000 scylla-gdb - tests for scylla-gdb.py helper script nodetool - tests for C++ implementation of nodetool

If you can use an existing folder, consider adding your test to it. New folders should be used for new large categories/subsystems, or when the test environment is significantly different from some existing suite, e.g. you plan to start scylladb with different configuration, and you intend to add many tests and would like them to reuse an existing Scylla cluster (clusters can be reused for tests within the same folder).