Cache update may defer in the middle of moving of partition entry
from a flushed memtable to the cache. If the schema was changed since
the entry was written, it upgrades the schema of the partition_entry
first but doesn't update the schema_ptr in memtable_entry. The entry
is removed from the memtable afterward. If a memtable reader
encounters such an entry, it will try to upgrade it assuming it's
still at the old schema.
That is undefined behavior in general, which may include:
- read failures due to bad_alloc, if fixed-size cells are interpreted
as variable-sized cells, and we misinterpret a value for a huge
size
- wrong read results
- node crash
This doesn't result in a permanent corruption, restarting the node
should help.
It's the more likely to happen the more rows there are in a
partition. It's unlikely to happen with single-row partitions.
Introduced in 70c7277.