# V3 Phase 15 G9D/F QA Test Instruction
|
||||
|
||||
Date: 2026-05-02
|
||||
Status: QA-verified on `phase-15@eeef486`
|
||||
Scope: lifecycle registration, placement planning, verified placement, and authority-boundary guards
|
||||
|
||||
## Headline
|
||||
|
||||
At `phase-15@eeef486`, G9D/F proves master can discover/register desired volume
|
||||
and node inventory, compute and verify placement readiness, but still does not
|
||||
grant authority.
|
||||
|
||||
## Environment
|
||||
|
||||
- Repo: `seaweed_block`
|
||||
- Branch: `phase-15`
|
||||
- Minimum commit: `eeef486`
|
||||
- Fidelity: component/L2 with real package wiring; not m01/M02 hardware
|
||||
- Non-claim: no production authority minting, frontend service, or recovery run
|
||||
|
||||
## Command
|
||||
|
||||
```powershell
|
||||
go test ./core/lifecycle ./core/host/master ./core/authority ./cmd/blockmaster ./cmd/blockvolume -count=1
|
||||
```
|
||||
|
||||
Expected result: all five packages pass. `cmd/blockvolume` can take about two
|
||||
minutes because it includes the G8 subprocess failover tests.
|
||||
|
||||
## Scenario Checklist
|
||||
|
||||
1. Desired volume persists.
|
||||
Backing test: `core/lifecycle/store_test.go::TestFileStore_CreateVolumePersistsAndIsIdempotent`
|
||||
|
||||
2. Node inventory persists.
|
||||
Backing test: `core/lifecycle/node_inventory_test.go::TestNodeInventoryStore_RegisterNodePersistsCapacityAndReplicas`
|
||||
|
||||
3. Planner produces placement intent.
|
||||
Backing test: `core/lifecycle/reconciler_test.go::TestReconcilePlacement_HappyPathWritesPlacementIntent`
|
||||
|
||||
4. Insufficient inventory fails closed.
|
||||
Backing test: `core/lifecycle/reconciler_test.go::TestReconcilePlacement_InsufficientInventoryReportsButDoesNotPersist`
|
||||
|
||||
5. Existing replica conflict fails closed.
|
||||
Backing test: `core/lifecycle/reconciler_test.go::TestReconcilePlacement_ExistingReplicaConflictIsReportOnly`
|
||||
|
||||
6. Verified placement requires observation.
|
||||
Backing tests: `core/lifecycle/verified_placement_test.go::TestG9F_PlacementIntentWithoutObservation_DoesNotVerify`,
|
||||
`core/host/master/lifecycle_test.go::TestMasterLifecycleSnapshot_PlacementWithoutNodeObservationIsNotVerified`
|
||||
|
||||
7. Fresh observation verifies an existing replica.
|
||||
Backing test: `core/host/master/lifecycle_test.go::TestMasterLifecycleSnapshot_ExistingReplicaVerifiesFromObservationStore`
|
||||
|
||||
8. Stale observation or missing address fails closed.
|
||||
Backing tests: `core/lifecycle/verified_placement_test.go::TestG9F_PlacementIntentWithStaleObservation_DoesNotVerify`,
|
||||
`core/lifecycle/verified_placement_test.go::TestG9F_FreshObservationMissingControlAddress_DoesNotVerify`
|
||||
|
||||
9. No authority side effect.
|
||||
Backing tests: `core/host/master/lifecycle_test.go::TestMasterLifecycleStore_OpensRegistrationStoresWithoutAuthority`,
|
||||
`core/host/master/lifecycle_test.go::TestMasterLifecycleSnapshot_ExistingReplicaVerifiesFromObservationStore`,
|
||||
`core/host/master/lifecycle_test.go::TestMasterLifecycleSnapshot_PlacementWithoutNodeObservationIsNotVerified`
|
||||
|
||||
## Non-Claims
|
||||
|
||||
- Does not auto-assign a newly created volume.
|
||||
- Does not make any blockvolume become primary or replica.
|
||||
- Does not start iSCSI, NVMe, or frontend service paths.
|
||||
- Does not start recovery, rebuild, or WAL feeding.
|
||||
- Does not call the authority publisher or mint epoch / endpoint-version facts.
|
||||
|
||||
## Closure Sentence
|
||||
|
||||
G9D/F is a verify-only fact-layer checkpoint: product intent and observation can
|
||||
produce `VerifiedPlacement`, but `VerifiedPlacement` is still not authority.
|
||||
@@ -1,10 +1,16 @@
|
||||
# V3 Phase 15 G9F - Placement Intent to Authority Bridge Mini-Plan
|
||||
|
||||
Date: 2026-05-02
|
||||
Status: architect draft; code must not start until §1.A is accepted
|
||||
Status: §1.A architect-ratified 2026-05-02 for verify-only first slice; implemented and merged at `phase-15@eeef486`
|
||||
Branch target: `p15-g9d/volume-lifecycle-intent` or successor branch off `phase-15`
|
||||
Scope: first bridge from placement intent facts toward authority publication
|
||||
|
||||
§1.A architect-ratified: 2026-05-02. Binding applies only to the verify-only first slice:
|
||||
`PlacementIntent + fresh Observation -> VerifiedPlacement`, with no publisher wiring and no
|
||||
authority minting. Any follow-up that turns `VerifiedPlacement` into an authority request,
|
||||
assignment ask, publisher apply, epoch, or endpoint-version change requires a separate G9F-2
|
||||
mini-plan and ratification.
|
||||
|
||||
## 0. Why this needs a mini-plan
|
||||
|
||||
G9D-A through G9D-E intentionally stayed on the observation/product-intent side:
|
||||
@@ -168,4 +174,3 @@ Only after the verify-only bridge is green:
|
||||
1. decide whether verified placement becomes input to existing `TopologyController`, a new placement controller, or a publisher directive adapter;
|
||||
2. write a separate mini-plan for the authority-minting slice;
|
||||
3. add a negative test that observation-only and placement-only each fail, while placement+fresh-observation can request authority.
|
||||
|
||||
|
||||